Evolution 80GX Spezifikationen Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
20 Hangar 9 Sukhoi SU-26MM SE
D. Use a hobby knife to trim the covering 1/8-inch
(3mm) away from the edges of the opening. The
excess material will be sealed back into position to
fuel-proof the area and make a clean installation of
the opening.
E. Use a covering iron to seal the edges of the covering
inside the fuselage.
F. Remove the covering from the bottom of the fuselage
and cut the stringers as shown. Repeat Steps D
through F to seal the covering around the opening.
This is necessary to allow cooling air to pass through
the fuselage to cool the canister muffler.
G. Remove the material from the cowling to clear the
exhaust system and to provide cooling air to pass
over the engine. Refer to the photos in the tuned pipe
section regarding mounting the cowling.
Rudder and Tail Wheel Installation
Required Parts
Fuselage assembly Rudder
Rudder hinge wire Tail wheel assembly
Tail wheel steering spring (2)
2.5mm x 18mm socket head sheet metal screw (2)
Required Tools and Adhesives
Thin CA Drill
Hex wrench: 3mm Ruler
Flat file Threadlock
Hex wrench: 2.5mm, 3/32 inch
1. Use a flat file to sharpen one end of the rubber hinge
wire. This will help the wire guide itself through the
hinges. Line the hinges up between the rudder and
fuselage. Insert the rudder hinge wire using a drill.
The wire will insert slightly in the rudder balance
tab so there is clearance for the tail wheel bracket
installed later in this section of the manual. Once
installed, the wire will extend 3/8-inch (9.5mm) below
the bottom of the fuselage.
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 31 32

Kommentare zu diesen Handbüchern

Keine Kommentare